relax, it will be ready. Good products always takes time to release. I'm waiting for it too!!
relax, it will be ready. Good products always takes time to release. I'm waiting for it too!!
HPT Beta= crack for the members of this forum.
Regards,
Brian Turner
Dyno Tune Motorsports
Dyno Tuning and Remote Tuning For Ford - GM - Chrysler Vehicles
Click Here For Dyno Tune Motorsports
1988 Ford Mustang GT INCON Systems TT
331 Cubic Inches - Corn - 808 RWHP 918 RWTQ
I can see it already. As soon as 2.24 is released... I give it less than a month before someone starts asking for Beta again (2.25)!! It's a never ending circle.
Regards,
Brian Turner
Dyno Tune Motorsports
Dyno Tuning and Remote Tuning For Ford - GM - Chrysler Vehicles
Click Here For Dyno Tune Motorsports
1988 Ford Mustang GT INCON Systems TT
331 Cubic Inches - Corn - 808 RWHP 918 RWTQ
'20 AT4
'01 Suburban 2500 Dad Wagon
i was wondering the same thing google. lol, work was rather boring this morning with nothing to read.
95 Maro LS1 Swap
03 Z-71 Silveraldo, Pewter ECSB
Our internet went down to our Ill office, this is where our internet server is housed, if the internet goes down to it no website.
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"
When did you release your latest beta?
Last edited by Bill@HPTuners; 11-22-2010 at 04:00 PM.
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"
Not sure exactly how Keith is going to work the link, the link name will be changing though. I'm sure I'll know more in the next 24-48 hours.
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"
Mmmmmm, early christmas present... drool
'20 AT4
'01 Suburban 2500 Dad Wagon
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"
Bill,
Why isn't it possible to get RTT for the E38?
I'm sure its possible however the amount of R&D time required for such an OS mod outweighs its gain from our experience.
Setting up a 2 bar custom os for a single E38 operating system takes our HEAD engineer roughly 2 days, lets say it took another day(not including R&D) to code in the RTT stuff and lets say there is 50 E38 operating systems, thats about 150 days of only working on that out of 240 business days in a year.
Sorry but we can't afford to spend 60% of our next year focused on a pcm that is very VERY close to the end of its life cycle.
-Bill
It doesn't have to be perfect, it just needs to be done in two weeks...
A wise man once said "google it"