Has anyone else encountered an issue with how HPT populates shift scheduling and pressures from the AD file to the AF file?
I've attached two original backup files showing the difference in how the trans calibration is populated.
Backup Andrus is the AD(older) OS.
original backup.hpt
ORIGINAL_BACKUP_ANDRUS.hpt
Thanks in advance!