I'm trying to set up the graph to show Shift 1-2, Shift 2-3, Shift 3-4, Shift 2-1, Shift 3-2, and Shift 4-3 on the ROW while having Throttle Position (%) on the column.
I can't seem to find the parameter to select to get the shifts - I have the Throttle Position setup.
Attached is the idea. How can I achieve this?